Skipton-on-Swale Bridge Maintenance Scheme

  • Client: North Yorkshire County Council
  • Location: Skipton-on-Swale, North Yorkshire
  • Value: £160,000
  • Period: October 2023 – November 2023 (3 weeks)

SCOPE DELIVERED

Bridge maintenance works completed at Skipton-on-Swale on behalf of North Yorkshire County Council.

  • Excavation of bridge deck to expose the barrels of the bridge which were then cleaned
  • Bridge backfilled with a foamed concrete mix as the bridge’s weight had to be kept to a minimum
  • Pouring of a C32/40 concrete slab on top of the foamed concrete ready to receive the road formation
  • New kerb line installed to either side of the bridge
  • One side of the bridge tarmacked for a pedestrian footway and the opposite side relayed with existing cobbles due to the grade 2 listing order on the bridge.
  • Bridge then tarmacked and reopened for use.

SUB-CONTRACTORS USED

  • Oneway TM – Traffic management
  • Precision Drilling – Drilling
  • EC Surfacing – Planing & Surfacing
  • Waterseal – Waterproofing & Mastic Fillet Works
  • John Mee Vac Ex – Vac Ex
  • GS Foam Concrete – Supplied & installed Foamed Concrete
  • BDS – Line Marking
  • Gardham Wold Landscapes – Vegetation Clearance