" class="d-block w-100" alt="...">

Grimsby Town Centre Accessibility Improvements

  • Client: North East Lincolnshire Council
  • Location: Grimsby Town Centre
  • Value: £1.2m
  • Period: March 2016 – October 2016

Completed in phases, works located within Grimsby town centre along Bethlehem Street, Osborne Street, East St Marys Gate & West St Marys Gate.

Works include the replacement of all existing kerb lines, reconstruction of all existing footways (block paving) including bus stops, carriageway resurfacing, renewal and installation of various street furniture, introduction of tree planting, upgrades to existing drainage system along with replacement of existing traffic signing.

The £1.2m scheme involved working around the public and outside local shops and businesses on a day to day basis ensuring site safety and minimum disruption at all times.

Completed to programme, the scheme involved maintaining live traffic flow through the town centre which systems varied on each phase of work, ensuring smooth traffic flow, shop access and pedestrian safety.

Arguably the busiest area of Grimsby, the scheme created a more user friendly area whilst complementing the town centre with the aesthetics of the new areas of block paving, street furniture and carriageway resurfacing.

Hull Building Safety Group Logo Construction Online