Housing WWTW Septic Tank Environmental Upgrades (Phase 4)

  • Client: East Riding Council
  • Locations: Harpham, East Yorkshire
  • Value: £103,000
  • Period: January 2024 – March 2024

GENERAL OVERVIEW

Installation of new wastewater treatment tank to replace existing septic tank with associated drainage works at two sites in Harpham.

SCOPE DELIVERED

  • Excavate and install temporary works for new tank
  • Install new tank
  • Install new drains and connect to tank along with PPICs
  • Backfill tank and remove shoring
  • Construct concrete slab to driveway and tanks
  • Re-instatement to gardens and paths
  • Commission tanks