Marfleet Lane Flyover Refurbishment

  • Client: Galliford Try
  • Location: Marfleet Lane, Hull
  • Value: £160,000
  • Period: September 2022 – October 2022

GENERAL OVERVIEW

Excavating the existing bridge deck and removing the existing steel beams to be replaced with new reinforcement and backfilled with concrete and type one stone.

SCOPE DELIVERED

  • Planed and disposed existing tarmacadam surfacing 200mm to expose the concrete bridge deck.
  • Excavate each 3.1m section by 2.10m in depth. Cut and remove the existing steel beams and dispose off site.
  • Shutter and pump foamed concrete into cavities under the existing footpath to strengthen the bridge.
  • Supply and install type one stone in 150mm layers to strengthen the bridge.
  • Install tarmacadam surfacing and line marking