Concrete Car Park Extension at Wyke Works

  • Client: Wykeland Group
  • Location: Wyke Works, Hedon Road, Hull
  • Value: £90,000
  • Period: June 2023 – July 2023

GENERAL OVERVIEW

  • The total area of the extension measured approximately 450m2.
  • This was excavated to 725mm in depth, type one stone was supplied and compacted in layer to a total depth of 550mm.
  • Reinforcement and dowels were installed for each base and concrete was poured at 175mm in depth.
  • Approximately 120m of kerbing was installed, as well as 55m of Aco drains connected to the existing gully.