" class="d-block w-100" alt="...">

Burniston Footbridge Installation

  • Client: North Yorkshire Council
  • Location: Cinder Track, Burniston, Scarborough
  • Value: £83,000
  • Period: July 2023 – August 2023

SCOPE DELIVERED

  • Installation of closure to Cinder Track cycleway
  • Carry out pointing to abutments
  • Installation of bird cage scaffolding
  • Removal of existing footbridge
  • Preparation of existing abutments including installation of shuttering and steel reinforcements
  • Installation of concrete abutments
  • Preparation of and installation of granular graded material to abutment approaches
  • Installation of new bridge beam
  • Construction of deck and parapets